HOUSE MAY 2005 |
New garage and stairwell foundation walls rise on new footings. |
The garage walls start. |
The studio walls start. |
The garage walls mostly up, gravel poured, and the car pulled into the new garage space for the very first time. |
The kitchen, pantry and stairwell/side entry as it was. |
More views of the kitchen north wall. |
|
Kitchen interior tearout. |
Roof removal over the kitchen and pantry. Russ, Gary, Frank and Craig. |
Using the Bobcat to remove debris. |
The kitchen, pantry, stairway and side entry gone. |
|
|
|
©2005 Phyllis & Larry Fast |